4173_Site visit, (Pile Driving Bent 1)
Contractor was still laying out Pile locations when I arrived.
Decker arrived at 11:30, Unloaded and move to Bent 1
Started Driving Pile on Bent 1
After taking with Engineer we decided to dig a pot hole and see what we was hitting. We found rock about 8 feet down on both sides. Will be changing to Pre-Bore.